• product up1

Products

Big discounting Bathroom Pipes And Fittings Mould - UPVC Yee Tee Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

To consistently enhance the management method by virtue of the rule of "sincerely, fantastic religion and top quality are the base of business development", we extensively absorb the essence of associated goods internationally, and constantly acquire new merchandise to satisfy the needs of shoppers for Cpvc Fitting Mould Plastic Tee, Irrigation Pipe Mould, Pipe Valve And Fitting Mould, We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
Big discounting Bathroom Pipes And Fittings Mould - UPVC Yee Tee Pipe Fitting Mould – Longxin Detail:

Quick Details

Origin: Taizhou, Zhejiang, China

Brand: UPVC mould

Model:UPVC Yee Tee Pipe Fitting Mould

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic UPVC Yee Tee Pipe Fitting Mould

Cavity: 2 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

UPVC Yee Tee Pipe Fitting Mould

The main Mould Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

Pipe Fitting Mould Features :High Automation multi cavities ,high precision,high productivity, long-lasting lifeWe have our own unique design for some moulds,

Our services

We longxin adhering to the principle of quality first, service first to serve each of our customers, professional production of PVC Sewage Or Y Tee Pipe Fitting Mould, Welcome to call and order

1. In-time response on letters, telephone calls or fax

2. In-time supply the quotation and mould designs

3. In-time sending pictures for the mould machining progress and mould finishing schedule

4. In-time sending pictures for the mould machining progress and mould finishing schedule

5. In-time mould delivery.

For more information please contact us.

Packing and delivery

How to pack PVC  Tee Pipe Fitting Mould flaring in wooden case:

First  : Daub rust preventive oil on the mould.

Second : We pack the mold with thin plastic film to avoid moisture.

Third : We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

UPVC Yee Tee Pipe Fitting Mould
Package delivery

FAQ:

Finally, a pair of pipe fitting molds have been made. Next, we have to test the effectiveness of the mold, that is, mold trial. Then put it into production, and how to maintain the mold during production, so that the mold can be in a better working condition and let us reap the greatest benefits?

Below we will introduce the things that we should pay attention to when trying out our pipe fitting molds for this UPVC Yee Tee pipe fitting molds:

1. Whether the mold opening and closing is smooth, and whether the ejection is smooth.

2. Pay attention to the position of the mold gate and the way of glue feeding, the size of the gate and the size of the cavity, and select the appropriate pressure, speed, and material volume for injection molding. 3. After the mold heats up, carefully check whether all the matching parts of the mold are too hard, and then confirm the bonding line and exhaust. After the product is full, ask the quality personnel to confirm the size and appearance.

4. During the mold production process, check the mold settings and safety devices to let the operating staff understand the possible problems in the process. After the production is completed, the lower mold or standby needs to take necessary measures for the machine and mold.

5.When the mold is not in production, the pipe fitting mold should be maintained. First check the mold and determine the maintenance method. If you need to disassemble the parts, first check whether there is a clear mark. After the maintenance of the parts is completed, the assembly should be matched and seated. After the assembly is completed, first confirm the sequence of the mold. Pay attention to the careful inspection and confirmation of the first piece after each maintenance, and the production can be continued after the quality personnel confirm OK.


Product detail pictures:

Big discounting Bathroom Pipes And Fittings Mould - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures

Big discounting Bathroom Pipes And Fittings Mould - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures

Big discounting Bathroom Pipes And Fittings Mould - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

We have probably the most state-of-the-art output equipment, experienced and qualified engineers and workers, recognized good quality manage systems plus a friendly skilled income workforce pre/after-sales support for Big discounting Bathroom Pipes And Fittings Mould - UPVC Yee Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: French, Roman, Saudi Arabia, We will not only continuously introduce technical guidance of experts from both home and abroad, but also develop the new and advanced products constantly to satisfactorily meet the needs of our clients all over the world.
  • Although we are a small company, we are also respected. Reliable quality, sincere service and good credit, we are honored to be able to work with you!
    5 Stars By Kitty from Costa Rica - 2018.06.05 13:10
    It's really lucky to find such a professional and responsible manufacturer, the product quality is good and delivery is timely, very nice.
    5 Stars By Karl from Victoria - 2018.11.28 16:25
    Write your message here and send it to us