• product up1

FAQs

FAQs

FAQ

FREQUENTLY ASKED QUESTIONS

Are you a trading company or a manufacturer?

We are A factory.

How do I get to your factory?

You can come to our city by plane, bus or train.It takes 2 hours to fly from Guangzhou to our city.It takes 3.5 hours to get to our city from Shanghai by train.It's only an hour by train from Ningbo to our city.

What is the quality control in your factory?

We believe that "quality is above everything". We have A professional team to control the quality. Our quality control team mainly performs the following steps.

Design optimization control B: hardness inspection of mold steel C: pipe fitting mold assembly inspectionD: Mould test report and sample inspection of pipe fitting E: final inspection of mould and package before shipment. If you have any other questions, please feel free to contact us as follows.

If I provide you with 3D drawings of the product, can you quote and make molds according to the 3D drawings?

Yes.DWG, DXF, STEP, IGS, and X_T files can be used to quote and make molds based on your model - this can save time and money in producing parts.What kind of mould can you make?

We can manufacture all kinds of plastic injection molds, PVC, PPR, PE and other pipe fittings molds. We can recommend the appropriate number of cavities according to the size of the injection molding machine

What are your terms of payment?

By t/T, L/C, trade guarantee and Western Union.

How long is your delivery time for molds?

After the mold drawing is approved, it takes 8-12 weeks to manufacture the mold, depending on the mold structure and the number of cavities (single or multiple). Delivery date will be calculated from the date when you approve our mold drawing. After you confirm our final sample, we can send you the plastic mould within one week.