• product up1

Products

Factory Cheap Hot China Ppr Elbow - PPR 45° Elbow Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We have been also specializing in improving the things administration and QC system to ensure that we could preserve terrific gain within the fiercely-competitive company for Upvc Pipe And Fittings Mould, Cpvc And Upvc Pipe Mould, Cpvc Fitting Mould Plastic Tee, Presently, we're wanting forward to even higher cooperation with abroad shoppers depending on mutual rewards. You should really feel totally free to make contact with us for more aspects.
Factory Cheap Hot China Ppr Elbow - PPR 45° Elbow Pipe Fitting Mould – Longxin Detail:

Introduce

Quick details

Origin: Taizhou, Zhejiang, China

Brand: PPR mould

Model: PPR 45°Elbow Pipe Fitting Mould

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic PPR pipe fitting mould

Cavity: 8-12 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

PPR 45° Elbow Pipe Fitting Mould

The Material

Our PPR 45° Elbow Pipe Fitting Mould, manufactured using the best quality steel and the most reasonable workmanship, has the following characteristics

1. The steel material used for our 45° Elbow Pipe Fitting Mould is: Steel plate S50C, P20, P20HH, 718H, 2738H, H13, S136, NAK80

2. Hardness (HRC) of the steel we choose: 17-22, 27-30, 33-37, 33-38, 36-40, 45-52, 48-52, 34-40

3, the cooling water system and the gate design according to the requirements of the product structure characteristics and product appearance design reasonable form of gate, a big gate, latent type gate and the fan gate, needle valve type, etc., reasonable flow channel structure design can make the mould in the shortest possible time balance mould temperature, in order to improve the precision of products and production efficiency

PPR 45° Elbow Pipe Fitting Mould

4. Wear resistant standard parts such as insert, guide post, guide sleeve, slide block, sliding block and inclined top block are adopted in the configuration of spare parts to improve the service life of the mould.

5. Mold surface treatment and mirror polishing;

6. Mold production cycle is expected to be 20-50 seconds

7. The service life of the target mold is more than 500,000 molds

8. It will take 60-90 days to complete the mold

Our Services

How to pack PPR 45°Elbow Pipe Fitting Mould flaring in wooden case:

First: Daub rust preventive oil on the mould.

Second: We pack the mold with thin plastic film to avoid moisture.

Third: We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

Package delivery


Product detail pictures:

Factory Cheap Hot China Ppr Elbow - PPR 45° Elbow Pipe Fitting Mould –  Longxin detail pictures

Factory Cheap Hot China Ppr Elbow - PPR 45° Elbow Pipe Fitting Mould –  Longxin detail pictures

Factory Cheap Hot China Ppr Elbow - PPR 45° Elbow Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

Our intention should be to fulfill our consumers by offering golden provider, superior price and superior quality for Factory Cheap Hot China Ppr Elbow - PPR 45° Elbow Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Frankfurt, Haiti, Spain, Our company always concentrate on the development of the international market. We now have a lot of customers in Russia , European countries, the USA, the Middle East countries and Africa countries. We always follow that quality is foundation while service is guarantee to meet all customers.
  • Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
    5 Stars By Martha from Doha - 2018.06.12 16:22
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Eunice from UK - 2017.02.18 15:54
    Write your message here and send it to us