• product up1

Products

Factory Supply Swr Pipe Mould - PVC Tee Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We strive for excellence, services the customers", hopes to be the top cooperation team and dominator business for personnel, suppliers and prospects, realizes benefit share and continual promotion for Astral Upvc Pipes Mould, Ppr Pipe Molds, Coupling Pipe Fitting Mould, We believe that you will be glad with our realistic selling price, high-quality products and solutions and rapid delivery. We sincerely hope you can give us an prospect to provide you and be your best partner!
Factory Supply Swr Pipe Mould - PVC Tee Pipe Fitting Mould – Longxin Detail:

Quick details

Origin: Taizhou, Zhejiang, China

Brand: PVC mould

Model: PVC  Tee Pipe Fitting Mould

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic PVC pipe fitting mould

Cavity: 2 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

er

The main pipe fitting Mould Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

Our Advantage

Packing And Delivery

How to pack PVC  Tee Pipe Fitting Mould flaring in wooden case:

First  : Daub rust preventive oil on the mould.

Second : We pack the mold with thin plastic film to avoid moisture.

Third : We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

rht (1)

Our Services

We are a professional design, manufacture PVC mould manufacturer. 15 years of experience in mould and injection moulding

1. In-time response on letters, telephone calls or fax

2. In-time supply the quotation and mould designs

3. In-time sending pictures for the mould machining progress and mould finishing schedule

4. In-time sending pictures for the mould machining progress and mould finishing schedule

5. In-time mould delivery.

For more information please contact us.

微信图片_20200929110131


Product detail pictures:

Factory Supply Swr Pipe Mould - PVC Tee Pipe Fitting Mould –  Longxin detail pictures

Factory Supply Swr Pipe Mould - PVC Tee Pipe Fitting Mould –  Longxin detail pictures

Factory Supply Swr Pipe Mould - PVC Tee Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

All we do is usually connected with our tenet " Customer to start with, Rely on initial, devoting on the food packaging and environmental protection for Factory Supply Swr Pipe Mould - PVC Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Jordan, Hamburg, Botswana, We have a dedicated and aggressive sales team, and many branches, catering to our customers. We are looking for long-term business partnerships, and ensure our suppliers that they will definitely benefit in both short and long run.
  • Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Anastasia from Philippines - 2018.06.21 17:11
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Kristin from Marseille - 2018.09.23 18:44
    Write your message here and send it to us