• product up1

Products

Factory wholesale Sewage Drainage Cpvc Elbow Pipe Fitting Mould - Upvc 45°Elbow Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

It is our responsibility to meet your needs and efficiently serve you. Your satisfaction is our best reward. We are looking forward to your visit for joint growth for Threaded Pipe Fittings Mould, Upvc Tee Pipe Fitting Mould, Sewage Drainage Ppr Elbow Pipe Fitting Mould, We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
Factory wholesale Sewage Drainage Cpvc Elbow Pipe Fitting Mould - Upvc 45°Elbow Fitting Mould – Longxin Detail:

Quick details

Origin: Taizhou, Zhejiang, China

Brand: PVC mould

Model: PVC 45 °flaring die

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic PVC pipe fitting mould

Cavity: 2 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

Elbow Fitting Mould

The main Mould Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

How to pack PVC  Tee Pipe Fitting Mould flaring in wooden case:

First  : Daub rust preventive oil on the mould.

Second : We pack the mold with thin plastic film to avoid moisture.

Third : We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

Package delivery

FAQ

Q1: Are you a trading company or a manufacturer?

A: We are A factory.

Q2: How do I get to your factory?
A: You can come to our city by plane, bus or train.It takes 2 hours to fly from Guangzhou to our city.It takes 3.5 hours to get to our city from Shanghai by train.It’s only an hour by train from Ningbo to our city.

Q3: What is the quality control in your factory?
A: We believe that “quality is above everything”. We have A professional team to control the quality. Our quality control team mainly performs the following steps:
A: Design optimization control B: hardness inspection of mold steel C: pipe fitting mold assembly inspectionD: Mould test report and sample inspection of pipe fitting E: final inspection of mould and package before shipment. If you have any other questions, please feel free to contact us as follows:

Q4: If I provide you with 3D drawings of the product, can you quote and make molds according to the 3D drawings?
A: Yes.DWG, DXF, STEP, IGS, and X_T files can be used to quote and make molds based on your model – this can save time and money in producing parts.What kind of mould can you make?
A: We can manufacture all kinds of plastic injection molds, PVC, PPR, PE and other pipe fittings molds. We can recommend the appropriate number of cavities according to the size of the injection molding machine

Q5: What are your terms of payment?
A: By t/T, L/C, trade guarantee and Western Union.

Q6: How long is your delivery time for molds?
A: After the mold drawing is approved, it takes 8-12 weeks to manufacture the mold, depending on the mold structure and the number of cavities (single or multiple). Delivery date will be calculated from the date when you approve our mold drawing. After you confirm our final sample, we can send you the plastic mould within one week.


Product detail pictures:

Factory wholesale Sewage Drainage Cpvc Elbow Pipe Fitting Mould - Upvc 45°Elbow Fitting Mould –  Longxin detail pictures

Factory wholesale Sewage Drainage Cpvc Elbow Pipe Fitting Mould - Upvc 45°Elbow Fitting Mould –  Longxin detail pictures


Related Product Guide:

"Sincerity, Innovation, Rigorousness, and Efficiency" is the persistent conception of our company for the long-term to develop together with customers for mutual reciprocity and mutual benefit for Factory wholesale Sewage Drainage Cpvc Elbow Pipe Fitting Mould - Upvc 45°Elbow Fitting Mould – Longxin , The product will supply to all over the world, such as: Liverpool, Libya, Ethiopia, Now we've been sincerely consider to grant brand agent in different areas and our agents' maximum margin of profit is the most important thing we care about. Welcome all of the friends and customers to join us. We have been ready to share win-win corporation.
  • A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Daisy from United States - 2017.08.16 13:39
    The quality of the products is very good, especially in the details, can be seen that the company work actively to satisfy customer's interest, a nice supplier.
    5 Stars By Henry stokeld from Czech Republic - 2017.09.26 12:12
    Write your message here and send it to us