• product up1

Products

Hot New Products Cpvc Yee Pipe Fitting Mould - PPR 45° Elbow Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Quality very first, Honesty as base, Sincere assistance and mutual profit" is our idea, in an effort to create consistently and pursue the excellence for Cpvc Yee Pipe Fitting Mould, Upvc Union Mould, Pvc 90 Degree Elbow Drainage Pipe Fitting Mould, We, with fantastic passion and faithfulness, are willing to offer you with best services and striding forward with you to make a bright foreseeable future.
Hot New Products Cpvc Yee Pipe Fitting Mould - PPR 45° Elbow Pipe Fitting Mould – Longxin Detail:

Introduce

Quick details

Origin: Taizhou, Zhejiang, China

Brand: PPR mould

Model: PPR 45°Elbow Pipe Fitting Mould

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic PPR pipe fitting mould

Cavity: 8-12 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

PPR 45° Elbow Pipe Fitting Mould

The Material

Our PPR 45° Elbow Pipe Fitting Mould, manufactured using the best quality steel and the most reasonable workmanship, has the following characteristics

1. The steel material used for our 45° Elbow Pipe Fitting Mould is: Steel plate S50C, P20, P20HH, 718H, 2738H, H13, S136, NAK80

2. Hardness (HRC) of the steel we choose: 17-22, 27-30, 33-37, 33-38, 36-40, 45-52, 48-52, 34-40

3, the cooling water system and the gate design according to the requirements of the product structure characteristics and product appearance design reasonable form of gate, a big gate, latent type gate and the fan gate, needle valve type, etc., reasonable flow channel structure design can make the mould in the shortest possible time balance mould temperature, in order to improve the precision of products and production efficiency

PPR 45° Elbow Pipe Fitting Mould

4. Wear resistant standard parts such as insert, guide post, guide sleeve, slide block, sliding block and inclined top block are adopted in the configuration of spare parts to improve the service life of the mould.

5. Mold surface treatment and mirror polishing;

6. Mold production cycle is expected to be 20-50 seconds

7. The service life of the target mold is more than 500,000 molds

8. It will take 60-90 days to complete the mold

Our Services

How to pack PPR 45°Elbow Pipe Fitting Mould flaring in wooden case:

First: Daub rust preventive oil on the mould.

Second: We pack the mold with thin plastic film to avoid moisture.

Third: We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

Package delivery


Product detail pictures:

Hot New Products Cpvc Yee Pipe Fitting Mould - PPR 45° Elbow Pipe Fitting Mould –  Longxin detail pictures

Hot New Products Cpvc Yee Pipe Fitting Mould - PPR 45° Elbow Pipe Fitting Mould –  Longxin detail pictures

Hot New Products Cpvc Yee Pipe Fitting Mould - PPR 45° Elbow Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

Our personnel are generally within the spirit of "continuous improvement and excellence", and using the excellent top quality goods, favorable rate and superior after-sales expert services, we try to win every customer's believe in for Hot New Products Cpvc Yee Pipe Fitting Mould - PPR 45° Elbow Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Kuwait, San Diego, venezuela, We've been adhering to the philosophy of "attracting customers with the best items and excellent service". We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
  • This manufacturer can keep improving and perfecting products and service, it is in line with the rules of market competition, a competitive company.
    5 Stars By Elaine from Greece - 2018.09.21 11:01
    It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
    5 Stars By Alva from Afghanistan - 2018.11.28 16:25
    Write your message here and send it to us