• product up1

Products

Manufacturer of Pvc Pipe Fittings Manufacturing Machine – CPVC Tee Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We emphasize progress and introduce new solutions into the market each year for High Pressure Pipe Fittings Mould, General Mold, Sewage Drainage Pvc Yee Pipe Fitting Mould, As we are moving forward, we keep an eye on our ever-expanding product range and make improvement to our services.
Manufacturer of Pvc Pipe Fittings Manufacturing Machine – CPVC Tee Pipe Fitting Mould – Longxin Detail:

Introduce

Customers who consult CPVC Tee Pipe Fitting Mould, please provide the following detailed requirements:

1. CPVC Tee Pipe Fitting Mould product picture and size, or (3D drawing)

2. How many cavities for different parts

3. The unit price needs to know the weight and raw materials

CPVC Tee Pipe Fitting Mould

FAQ:

Finally, a pair of pipe fitting molds have been made. Next, we have to test the effectiveness of the mold, that is, mold trial. Then put it into production, and how to maintain the mold during production, so that the mold can be in a better working condition and let us reap the greatest benefits?

Below we will introduce the things that we should pay attention to when trying out our pipe fitting molds for this CPVC Tee Pipe Fitting Mould:

1. Whether the mold opening and closing is smooth, and whether the ejection is smooth.

2. Pay attention to the position of the mold gate and the way of glue feeding, the size of the gate and the size of the cavity, and select the appropriate pressure, speed, and material volume for injection molding.

3. After the mold heats up, carefully check whether all the matching parts of the mold are too hard, and then confirm the bonding line and exhaust. After the product is full, ask the quality personnel to confirm the size and appearance.

4. During the mold production process, check the mold settings and safety devices to let the operating staff understand the possible problems in the process. After the production is completed, the lower mold or standby needs to take necessary measures for the machine and mold.

5.When the mold is not in production, the pipe fitting mold should be maintained. First check the mold and determine the maintenance method. If you need to disassemble the parts, first check whether there is a clear mark. After the maintenance of the parts is completed, the assembly should be matched and seated. After the assembly is completed, first confirm the sequence of the mold. Pay attention to the careful inspection and confirmation of the first piece after each maintenance, and the production can be continued after the quality personnel confirm OK.


Product detail pictures:

Manufacturer of Pvc Pipe Fittings Manufacturing Machine – CPVC Tee Pipe Fitting Mould –  Longxin detail pictures

Manufacturer of Pvc Pipe Fittings Manufacturing Machine – CPVC Tee Pipe Fitting Mould –  Longxin detail pictures

Manufacturer of Pvc Pipe Fittings Manufacturing Machine – CPVC Tee Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

So that you can finest fulfill client's demands, all of our operations are strictly performed in line with our motto "High Excellent, Competitive Price, Fast Service" for Manufacturer of Pvc Pipe Fittings Manufacturing Machine – CPVC Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Cyprus, UAE, Cape Town, Our Company has professional engineers and technical staff to answer your questions about maintenance problems, some common failure. Our product quality assurance, price concessions, any questions about the products, Please feel free to contact us.
  • We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Janice from Bandung - 2017.05.02 11:33
    Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
    5 Stars By Novia from Vancouver - 2018.09.29 17:23
    Write your message here and send it to us