• product up1

Products

OEM manufacturer Fitting Mould - CPVC Tee Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our products are broadly identified and trustworthy by people and may meet continually modifying financial and social requires of Upvc Drainage Mould, Plastic Injection Pipe Fitting Mold, Pvc Pipe Mould, We always hold the philosophy of win-win, and build long-term cooperation relationship with customers from around the world.We believe that our growth base on customer's success, credit is our life.
OEM manufacturer Fitting Mould - CPVC Tee Pipe Fitting Mould – Longxin Detail:

Introduce

Customers who consult CPVC Tee Pipe Fitting Mould, please provide the following detailed requirements:

1. CPVC Tee Pipe Fitting Mould product picture and size, or (3D drawing)

2. How many cavities for different parts

3. The unit price needs to know the weight and raw materials

CPVC Tee Pipe Fitting Mould

FAQ:

Finally, a pair of pipe fitting molds have been made. Next, we have to test the effectiveness of the mold, that is, mold trial. Then put it into production, and how to maintain the mold during production, so that the mold can be in a better working condition and let us reap the greatest benefits?

Below we will introduce the things that we should pay attention to when trying out our pipe fitting molds for this CPVC Tee Pipe Fitting Mould:

1. Whether the mold opening and closing is smooth, and whether the ejection is smooth.

2. Pay attention to the position of the mold gate and the way of glue feeding, the size of the gate and the size of the cavity, and select the appropriate pressure, speed, and material volume for injection molding.

3. After the mold heats up, carefully check whether all the matching parts of the mold are too hard, and then confirm the bonding line and exhaust. After the product is full, ask the quality personnel to confirm the size and appearance.

4. During the mold production process, check the mold settings and safety devices to let the operating staff understand the possible problems in the process. After the production is completed, the lower mold or standby needs to take necessary measures for the machine and mold.

5.When the mold is not in production, the pipe fitting mold should be maintained. First check the mold and determine the maintenance method. If you need to disassemble the parts, first check whether there is a clear mark. After the maintenance of the parts is completed, the assembly should be matched and seated. After the assembly is completed, first confirm the sequence of the mold. Pay attention to the careful inspection and confirmation of the first piece after each maintenance, and the production can be continued after the quality personnel confirm OK.


Product detail pictures:


Related Product Guide:

We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate inside our success for OEM manufacturer Fitting Mould - CPVC Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Ghana, Johor, Auckland, we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we've gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.
High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
5 Stars By Priscilla from Sudan - 2018.11.22 12:28
We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
5 Stars By Quintina from Panama - 2017.11.29 11:09
Write your message here and send it to us