• product up1

Products

OEM Supply Upvc Pipe Fitting Moulds - CPVC Tee Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Often customer-oriented, and it's our ultimate target to become not only probably the most reputable, trustable and honest provider, but also the partner for our customers for Upvc Reducer Mould, Upvc Plumbing Pipe Mould, Pvc Pipe Fitting Mould Manufacturer, If you are looking for a good quality, fast delivery, best after service and good price supplier in China for long-term business relationship, we will be your best choice.
OEM Supply Upvc Pipe Fitting Moulds - CPVC Tee Pipe Fitting Mould – Longxin Detail:

Introduce

Customers who consult CPVC Tee Pipe Fitting Mould, please provide the following detailed requirements:

1. CPVC Tee Pipe Fitting Mould product picture and size, or (3D drawing)

2. How many cavities for different parts

3. The unit price needs to know the weight and raw materials

CPVC Tee Pipe Fitting Mould

FAQ:

Finally, a pair of pipe fitting molds have been made. Next, we have to test the effectiveness of the mold, that is, mold trial. Then put it into production, and how to maintain the mold during production, so that the mold can be in a better working condition and let us reap the greatest benefits?

Below we will introduce the things that we should pay attention to when trying out our pipe fitting molds for this CPVC Tee Pipe Fitting Mould:

1. Whether the mold opening and closing is smooth, and whether the ejection is smooth.

2. Pay attention to the position of the mold gate and the way of glue feeding, the size of the gate and the size of the cavity, and select the appropriate pressure, speed, and material volume for injection molding.

3. After the mold heats up, carefully check whether all the matching parts of the mold are too hard, and then confirm the bonding line and exhaust. After the product is full, ask the quality personnel to confirm the size and appearance.

4. During the mold production process, check the mold settings and safety devices to let the operating staff understand the possible problems in the process. After the production is completed, the lower mold or standby needs to take necessary measures for the machine and mold.

5.When the mold is not in production, the pipe fitting mold should be maintained. First check the mold and determine the maintenance method. If you need to disassemble the parts, first check whether there is a clear mark. After the maintenance of the parts is completed, the assembly should be matched and seated. After the assembly is completed, first confirm the sequence of the mold. Pay attention to the careful inspection and confirmation of the first piece after each maintenance, and the production can be continued after the quality personnel confirm OK.


Product detail pictures:

OEM Supply Upvc Pipe Fitting Moulds - CPVC Tee Pipe Fitting Mould –  Longxin detail pictures

OEM Supply Upvc Pipe Fitting Moulds - CPVC Tee Pipe Fitting Mould –  Longxin detail pictures

OEM Supply Upvc Pipe Fitting Moulds - CPVC Tee Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

Our pursuit and company intention is usually to "Always fulfill our purchaser requirements". We go on to acquire and layout excellent high quality products for both our previous and new consumers and realize a win-win prospect for our customers too as us for OEM Supply Upvc Pipe Fitting Moulds - CPVC Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Slovenia, Azerbaijan, French, We critically promise that we deliver all the customers with the best quality solutions, the most competitive prices and the most prompt delivery. We hope to win a resplendent future for customers and ourselves.
  • This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
    5 Stars By Carey from Zambia - 2017.09.26 12:12
    The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Klemen Hrovat from Slovakia - 2018.12.30 10:21
    Write your message here and send it to us