• product up1

Products

Short Lead Time for Pvc Mould Fittings Mould - PVC Tee Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Based on domestic market and expand overseas business" is our development strategy for Cpvc Elbow Pipe Fitting Mould, Cpvc Plastic Elbow 90 Fitting Mould, Plastic Pipe Fittings Mold, We encourage you to make get hold of as we've been wanting for companions inside our venture. We are sure you'll uncover doing company with us not only fruitful but also profitable. We've been prepared to provide you with what you require.
Short Lead Time for Pvc Mould Fittings Mould - PVC Tee Pipe Fitting Mould – Longxin Detail:

Quick details

Origin: Taizhou, Zhejiang, China

Brand: PVC mould

Model: PVC  Tee Pipe Fitting Mould

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic PVC pipe fitting mould

Cavity: 2 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

er

The main pipe fitting Mould Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

Our Advantage

Packing And Delivery

How to pack PVC  Tee Pipe Fitting Mould flaring in wooden case:

First  : Daub rust preventive oil on the mould.

Second : We pack the mold with thin plastic film to avoid moisture.

Third : We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

rht (1)

Our Services

We are a professional design, manufacture PVC mould manufacturer. 15 years of experience in mould and injection moulding

1. In-time response on letters, telephone calls or fax

2. In-time supply the quotation and mould designs

3. In-time sending pictures for the mould machining progress and mould finishing schedule

4. In-time sending pictures for the mould machining progress and mould finishing schedule

5. In-time mould delivery.

For more information please contact us.

微信图片_20200929110131


Product detail pictures:

Short Lead Time for Pvc Mould Fittings Mould - PVC Tee Pipe Fitting Mould –  Longxin detail pictures

Short Lead Time for Pvc Mould Fittings Mould - PVC Tee Pipe Fitting Mould –  Longxin detail pictures

Short Lead Time for Pvc Mould Fittings Mould - PVC Tee Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

We're proud from the higher client fulfillment and wide acceptance due to our persistent pursuit of high quality both on product and service for Short Lead Time for Pvc Mould Fittings Mould - PVC Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Honduras, Mauritania, Russia, Taking the core concept of "to be the Responsible". We'll redound up on society for high quality merchandise and good service. We will initiative to participate in international competition to be a first- class manufacturer of this product in the world.
  • The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.
    5 Stars By Marcy Real from Spain - 2018.12.10 19:03
    The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Olga from Ghana - 2018.06.26 19:27
    Write your message here and send it to us